
OUR CASES STUDIES
OUR REFERENCES
Postel 2001 Tower
Location : Plateau, Abidjan, Côte d’Ivoire
Size : 34 568 m²
Structure : High-Rise Building (IGH), Offices

Sustainable performance: operational efficiency and cost control.
The ANSUT, a national agency dedicated to Côte d’Ivoire’s digital transformation and equitable access to telecommunications services, operates out of the Postel 2001 Tower. Following its renovation in 2001, the client sought a management approach to ensure the sustainability of its installations and equipment while optimizing the budget allocated to general services.
Challenges
- High demands in resource management: ensuring rigorous management of resources to achieve optimal efficiency in general services.
- Need for precise cost control in equipment procurement: essential to strike a balance between quality and cost for durable and cost-effective investments.
- Involvement of multiple contractors: requiring effective coordination with external providers to maintain seamless operations.
Solutions
- Precise and proactive management: implementation of a tailored, optimized management solution with high-quality multi-technical and multi-service operations.
- Transparency and efficiency enabled by Computerized Maintenance Management Systems (CMMS).
- Preventive maintenance and rapid interventions: anticipating needs and ensuring responsiveness to minimize interruptions and optimize costs
Results
- Extended equipment lifespan and fewer interruptions, ensuring service continuity and reducing operational costs.
- Improved visitor experience with welcoming spaces and efficient safety procedures.
- Pleasant working environment for employees, with high-quality maintenance of offices and shared spaces.